Rules for Feeding the Stash

Wednesday, October 8, 2014

WIP: Shelves Upon Shelves

My current pair of socks has been kicking around in my purse since the end of August. I love this pattern, and I love the colors in the yarn. The first sock was done in three days, but since then I've only managed to work a couple of rounds at a time on the second one.
Once these are done, I think they'll be a favorite pair. I don't know if I've ever matched a pattern to a yarn so well-I love how the horizontal lines work with the stripes. I'm a bit worried about how these will hold up-I worry about the durability of the long floats, but these are certainly going to be very pretty, and I'm having a lot of fun knitting them.

1 comment:

  1. Wow, 3 days is really fast! And the matching up of those horizontal floats with the stripes is pretty amazing, like you planned it out completely.

    ReplyDelete